KWSB saves 15mgd by repairing valves

KARACHI: Karachi Water & Sewerage Board (KWSB) staff on Tuesday saved 15 mgd water from being wasted by immediate repairing on leakages of two valves at Dhabeji Pumping Station.

Spokesperson KWSB said the complicated repairing work on the valves was completed within record time of five hours under the supervision of Chief Engineer Bulk Sikander Zardari by utilizing available resources with KWSB. 15 mgd water was daily being wasted from the valves.

The repairing work temporarily disturbed water supply to Gulistan-e-Johar, Gulshan-e-Iqbal and Pir Colony.